Status: Completed
Project Number: 23
Category: Multi-Use Path System
Location: HWY 54 W in Line Creek Nature Area
Proposed Project Year: 2017
Original Project Budget: $44,233
Project/Goal Description: New path connecting the existing path at the southern end of the Line Creek Nature Area parking lot to the new path at the northern entrance of the park.
Final Update: Public Works observed wheel tracks coming from the existing gravel area at the Line Creek Nature Center going up the power line easement and connecting to the MacDuff Crossing shopping center. Since this appeared to be the preferred method of travel for carts, Public Works graded and graveled this path up to the connection with the future access road. Under current conditions, with the access road to the MacDuff Shopping Center now being paved and connected, creating an additional path up to SR 54 is no longer needed.
SPLOST Actuals Total: $11,034
SPLOST Funds Over/Under Budget: $33,199
Proposed Project Photo:

Final Project Photos: