2017 Project 23: New Path Connection – Line Creek Nature Area

Status: Completed

Project Number: 23

Category: Multi-Use Path System

Location: HWY 54 W in Line Creek Nature Area

Proposed Project Year: 2017

Original Project Budget: $44,233

Project/Goal Description: New path connecting the existing path at the southern end of the Line Creek Nature Area parking lot to the new path at the northern entrance of the park.

2022 Progress Update:  Public Works observed wheel tracks coming from the existing gravel area at the Line Creek Nature Center going up the power line easement and connecting to the MacDuff Crossing shopping center.  Since this appeared to be the preferred method of travel for carts, Public Works graded and graveled this path up to the connection with the future access road.  Under current conditions, with the access road to the MacDuff Shopping Center now being paved and connected, creating an additional path up to SR 54 is no longer needed. 

SPLOST Actuals Total$11,034 

SPLOST Funds Over/Under Budget: $33,199