FAQs
Click to Home

Go To Search
MacDuff Parkway/ Wilksmoor Village

IS UNDER CONSTRUCTION - LITERALLY!!



Check back for updated construction photos of the MacDuff Parkway extension, the progress of the bridge spanning the CSX rail line, and the enhancements to the MacDuff Parkway/ Kedron Drive/ Senoia Road intersection.

We will also be adding periodic updates associated with the Everton at Wilksmoor and Cresswind at Peachtree City subdivisions.

E-mail us at  if you have additional questions or concerns.



MacDuff Parkway - general overview and design elements

The extension of MacDuff Parkway includes a wide, landscaped median, traffic calming elements (speed tables) at most intersections and designated pedestrian and golf cart crossings throughout the corridor.  A multi-use path parallels the roadway and interconnects each of the residential subdivisions with our current path system.  The bridge spanning the CSX rail line includes a separated lane for path users.

The MacDuff Parkway/ Kedron Drive/ Senoia Road intersection includes a traffic signal and a dedicated pedestrian/ multi-use path crossing.  The path will then extend along Kedron Drive to the existing multi-use path separating the Belvedere and Sagamore subdivisions which will provide access to the existing multi-use tunnel underneath Highway 74 and ultimately the Kedron Fieldhouse and Aquatic Center, Kedron Elementary School, the Kedron Village retail center and beyond.

The link below includes an overall view of MacDuff Parkway (Highway 54 West to Senoia Road/ Kedron Drive intersection).

MacDuff Parkway - overall




Parkside at Everton (Phase 1)
IMG_1950_thumb_thumb_thumb_thumb.jpg
Parkside at Everton

The Everton at Wilksmoor subdivision is being developed by Pulte Homes/ John Wieland Homes and Neighborhoods and will ultimately span both sides of MacDuff Parkway and
include a total of 679 homes.
 

Parkside at Everton includes a total of 204 lots and is located on the east side of MacDuff Parkway.  The infrastructure within Phase One of the subdivision is complete and homes are currently under construction.  This phase will include 84 lots and an amenity center.  


Cresswind at Peachtree City

The Cresswind at Peachtree City subdivision is being developed by Kolter Homes and will ultimately include a total of 675 age-restricted home site. 

The infrastructure associated with Phase One of the subdivision is currently under construction.  In addition, the developer is constructing a model home park that will include 14 furnished model homes as well as a sales center for the subdivision.